Skip to main content
HS
HiSETSuccess
LeetCode Prep

AI & FDE Interview Room

Role paths, mocks, cost studio, chapters, cases, and staff-level depth.

Case study · FDE · 40 min

Taking an AI PoC to Production

Plan the path from a flashy demo to a production AI feature with evals, security review, and a 6-week delivery timeline.

FDEdeliveryMVP

Interview opener

Three-week PoC that executives expect to become production.

  1. 1.IT security timeline is 6 weeks — your move?
  2. 2.Champion wants flash over foundations — push back how?
  3. 3.What artifacts remain if you leave day 21?

Strong signals

Hit 0/3

Weak signals (avoid)

  • Demo theater without data path
  • No success metrics

Requirements

  • Context: sales-led PoC chatbot demoed on sample PDFs; customer wants prod in 6 weeks
  • Must-have: SSO, ACL, audit logs, eval gate, support runbook
  • Success: 200 pilot users; CSAT ≥ 4.0; groundedness ≥ 85%; p95 < 5s
  • Constraints: customer VPC; no training on their data; change freeze week 6

Kill scope early

List explicit non-goals (agents, write-back, mobile). Map MoSCoW with the champion in week 0.

Back-of-envelope Estimation

MetricCalculationResult
Pilot queries/day200 users × 51,000
LLM cost/day1K × 3K tokens × $2/1M~$6
Eng weeks2 FDE + 1 SE × 618 eng-weeks
Security review buffer1.5 weeksparallelize docs early
Eval set size150 golden Qs~2 eng-days to label

API Design

EndpointMethodDescription
POST /v1/askPOSTProd Q&A with SSO JWT
GET /v1/healthGETDependency checks for customer NOC
POST /v1/admin/reindexPOSTTrigger corpus refresh
GET /v1/metricsGETPrometheus scrape endpoint

Data Model

EntityKey fieldsNotes
pilot_usersuser_id, cohort, trained_atTrack enablement
eval_casescase_id, question, expected_docsCustomer-labeled
deploymentsenv, version, config_hashStaging vs prod

High-level Design

6-week plan
W0: scope + data access + MoSCoW + threat model
W1: SSO + VPC deploy skeleton + sample ingest
W2: ACL retrieval + golden eval v1
W3: UX harden + logging/PII redaction
W4: security review + load test + runbooks
W5: pilot cohort on + feedback loop
W6: go-live checklist + hypercare + handoff docs

PoC demo ──► staging (customer VPC) ──► prod canary 10% ──► 100%

Deep Dive: PoC Debt to Pay Down

  • Replace hard-coded prompts with versioned configs
  • Add eval CI before any prompt tweak reaches prod
  • Wire real IdP groups — PoCs often fake ACLs
  • Document on-call ownership and rollback (previous model/prompt)

Bottlenecks at Scale

  • Data access delayed by legal — start DSARs week 0
  • Security questionnaire lag — answer in parallel with build
  • Champion vacation — identify backup decision maker

Failure Modes & Monitoring

SLOTargetAlert
Pilot CSAT≥ 4.0Weekly review
Groundedness≥ 85%Block expand if < 80%
Sev-1 MTTR< 60 minPage FDE + customer IT
Rollback drillPassed onceBefore go-live

Attempt the case aloud first. Then unlock a staff model answer outline.